Staff Analysis of the Legislation
|
Summary of the bill as introduced: Requires an electrical utility to bury all new electrical power transmission lines within the boundaries of a municipality in the state beginning on January 2, 2022. This bill also requires the electric utility to bury all lines by January 2027. |