SB 0319 - Requirements for Building Below Category II Dams
Login to post your comments

Tracking Level: Neutral
Sponsor: Frank Ginn (R)
Last Action: 2/26/2020 - House Second Readers
Senate Committee: Natural Resources and the Environment
House Committee: Natural Resources and Environment
Assigned To:
Kathleen BowenNext Bill

Staff Analysis of the Legislation

This legislation does the following:
  • Adds a new term "inundation zone”. Inundation zone = any area downstream of a dam that would be affected by flooding from releases from a dam's reservoir in the event of a failure, breach, or uncontrolled release of water, and is generally much larger than the area for a normal river or stream flood event.
  • Prohibits the building of inhabitable structures in the inundation zone of a Category II dam without prior certification from an engineer of record.
  • Allows for an engineer of record to perform and certify a breach analysis where inhabitable structures already exist in the inundation zone of a Category II dam.
  • Requires a certified breach analysis to be filed with the Superior Court, the local government where the inundation zone is located, and the Safe Dams division of EPD.
  • Authorizes the Department of Community Affairs to develop building standards for inhabitable structures in the inundation zone of a Category II dam.